The Terrys' Full Home Renovation

Address

3806 Carmona Ave, Los Angeles

Home

4 Bed / 3 Bath · 1,842 sqft

Construction Design Fees Phase 1

Technical design services for the three Phase 1 build zones: kitchen, master bath addition, and guest bath. Includes space planning, elevation drawings, MEP (Mechanical, Electrical, Plumbing) coordination drawings, cabinetry shop drawing coordination, material and finish specifications, and 3D renders. Your General Contractor executes the build: these fees cover the design work that makes it buildable and intentional.

Phase 1 Design Fees by Space

Phase 1 Design Fee: All Three Spaces
$13,500 flat
Kitchen · Master Bath Addition · Guest Bath: all three spaces covered under one flat design fee, inclusive of MEP (Mechanical, Electrical & Plumbing) coordination drawings. No à la carte options.
◆ Kitchen ◎ Master Bath Addition ◈ Guest Bath

What's Included by Space

Design deliverables are due 10 business days from deposit. To meet this timeline, clients must provide 5–7 inspiration images per space (for design alignment) and existing home floor plans prior to kickoff. The 10-day clock begins once deposit and all required materials are received.

◆
Kitchen
Full technical design package: space planning, cabinetry coordination, elevations, renders
Included in flat fee
▾
Full design presentation including all deliverables below
Design Vision Moodboard: 2D curated board establishing the design direction for the space
Color palette and material direction
Finishing selections: tile, hardware, fixtures
Space Planning & Functional Floor Plan Layout
Cabinetry shop drawing coordination with GC
Elevation drawings: all four walls
Appliance placement and MEP coordination notes
Lighting and electrical coordination
Inspiration material board: curated vision guideline for GC sourcing
Material and finish specification board
3D render for client approval before GC builds
Two rounds of revisions included
Construction labor and materials are your GC's scope. Stone, tile, and soft finishes sourced separately through Designer if requested.
◎
Master Bath Addition
New construction: full technical design package including addition layout
Included in flat fee
▾
Full design presentation including all deliverables below
Design Vision Moodboard: 2D curated board establishing the design direction for the space
Addition layout and space planning
Color palette and material direction
Finishing selections: tile, hardware, fixtures
Floor plan with plumbing placement
Elevation drawings: shower, vanity, feature walls
Cabinetry shop drawing coordination with GC
Lighting and electrical coordination
Fixture and finish specification board
Inspiration material board: curated vision guideline for GC sourcing
3D render for client approval before GC builds
Two rounds of revisions included
Construction labor and materials are your GC's scope. Tile, fixtures, and vanities sourced separately through Designer if requested.
◈
Guest Bath Remodel
Full technical design package: gut and remodel scope
Included in flat fee
▾
Full design presentation including all deliverables below
Design Vision Moodboard: 2D curated board establishing the design direction for the space
Color palette and material direction
Finishing selections: tile, hardware, fixtures
Space Planning & Functional Floor Plan Layout
Floor plan with plumbing placement
Elevation drawings: shower, vanity wall
Cabinetry shop drawing coordination with GC
Lighting and electrical coordination
Fixture and finish specification board
Inspiration material board: curated vision guideline for GC sourcing
3D render for client approval before GC builds
Two rounds of revisions included
Construction labor and materials are your GC's scope. Tile, fixtures, and vanities sourced separately through Designer if requested.
◇
Hidden Hallway Wardrobe
Add-on: flush concealed wardrobe spanning full hallway width
$1,800
Design fee only: GC executes build
▾
Full-span hallway space planning and layout
Concealed panel mechanism coordination with GC (push-open or track)
Interior cabinetry, shelving, and rod layout
Material and finish specification to match surrounding hallway
Final scope subject to field measurements of hallway span. Construction labor and materials are your GC's scope.

Optional Add-On

Optional Add-On · Phase 1
Hidden Hallway Wardrobe
Full-span concealed wardrobe: flush to the hallway wall, push-open or track mechanism. Design fee covers space planning, panel coordination with GC, interior cabinetry and finish specification. Final scope subject to field measurements.
$1,800
Design fee only: GC executes build
Subject to field measurements
Full-span hallway space planning and layout
Concealed panel mechanism coordination with GC
Interior cabinetry, shelving, and rod layout
Material and finish specification to match surrounding hallway
Chimney removal and structural beam work are fully within your GC's scope: no design fee applies to structural demolition work.

Why PM & Procurement Are Part of This Engagement

A skilled builder focuses on what they build best: the structure, the systems, the physical execution. What often falls outside a contractor's scope is the coordination layer: tracking material lead times against the construction schedule, flagging spec conflicts before they become expensive mistakes, keeping the client informed without requiring them to be on-site, and ensuring every finish that gets installed was the one that was actually selected and approved.

Because your project involves custom design specifications: concealed millwork, fixture selections, finish schedules, and material sequencing: someone needs to hold that thread from design approval through final installation. That is what project management and procurement oversight provides.

This is not a reflection of your contractor's capability. It is a recognition that design management and construction management are two different disciplines. Our role is to bridge them: translating design intent into clear specifications your GC can execute, and keeping you informed at every stage so you are never in the dark about your own home.

A Note on Material Sourcing

General Contractor's Scope

Your General Contractor is responsible for sourcing all major construction materials within his scope of work. We will provide specifications and approved selections for all finishes so that his sourcing stays aligned with the design intent.

Designer's Soft Finish Scope

That said, there are moments in every project where a client wants a second opinion, an alternative option, or a finish that falls outside what a contractor typically sources: lighting, door hardware, faucets, paint, switch plates, specialty tile. If sourcing support is requested beyond design specifications already provided, that work is scoped and billed at our standard sourcing rate of $125/hr. We will always communicate before that clock starts so there are no surprises.

GC Specification Compliance

Designer is responsible for design direction and specification of all finishes. If materials sourced by the General Contractor deviate from approved specifications, Designer reserves the right to reject non-conforming materials and require substitution at no additional design fee. Designer is not responsible for the quality, cost, or lead time of materials sourced independently by the General Contractor.

Samples & Materials: Pre-Payment Policy

Sparrow+Aire Studio does not advance the cost of samples or materials on behalf of the client. Prior to placing any order, Designer will issue a written confirmation of cost itemizing the sample or material, vendor, quantity, and total due. Client pays that amount in full before the order is placed. This applies to every purchase regardless of size. No exceptions.

PM & Procurement Services: Phase 1

All PM and procurement services are billed at $125/hr and invoiced bi-weekly at actual hours worked. The projection below shows estimated weekly spend by construction phase so you always know what to expect on your next invoice before it arrives.

Phase Weeks PM Hrs Sourcing Est./Week
Kickoff
Setup & schedule
Wks 1–2 10 hrs None: design phase
$1,250
per week
Demo
Rough-in begins
Wks 3–5 10–12 hrs None: site not ready
$1,250–$1,500
per week
Framing
Systems + layout
Wks 6–7 10–12 hrs
Sourcing begins
10 hrs/wk: hardware, lighting
$2,500
per week
Finish Phase
Full sourcing active
Wks 8–10 10–12 hrs
Full: 10–15 hrs/wk
Faucets, sinks, toilets, paint, switches
$2,500–$3,375
per week
Closeout
Punch list + sign-off
Wks 11–12 10 hrs
Winding down
Final confirmations only
$1,250–$1,875
per week
Phase 1 Estimated Total (PM + Sourcing combined)
Actual hours billed bi-weekly: this is a planning estimate, not a cap
$19,000–$33,300
Billing is bi-weekly at actual hours. Each invoice includes a full time log with dates, tasks, and hours so you always see exactly what drove the number before you pay it.

How We Notify You Before Sourcing Begins

Sourcing hours are never a surprise. Three checkpoints ensure you know exactly when the clock starts and what it is running for.

01

Phase Transition Notice

When demo wraps and sourcing is about to begin, you receive a formal written confirmation: "We are entering the finish phase. Soft finish sourcing will begin this week. Estimated 10–15 hrs/week at $125/hr. Reply to confirm you would like to proceed." Your reply is required before the clock starts.

02

Friday Report Preview

Every Friday status report closes with a sourcing preview for the following week: what items are being researched, which vendors or showrooms are being visited, and the estimated hours. You always see next week's sourcing before it happens.

Note: the accuracy of the Friday report is dependent on what the General Contractor provides during site visits: material samples, vendor information, and progress on materials he has sourced. Kimberly will report on what has been made available to her. If GC does not provide timely field notes or samples, the report will reflect that gap.

03

Session Authorization: Over 3 Hours

If a single sourcing session will exceed 3 hours: a slab visit, showroom run, or extended research block: a quick text confirmation is sent before it begins: "Heading to [vendor] for [item]. Estimated 4 hours. Confirming before I go." One reply, clock starts. No session over 3 hours runs without your green light.

Phase 1 Fee Summary
Phase 1 Design Fee: Kitchen, Master Bath, Guest Bath$13,500
Hidden Hallway Wardrobe: optional add-on$1,800
PM & Trade Coordination: estimated$1,250–$1,500/wk · Wks 1–7
Soft Finish Sourcing: estimated$1,250–$1,875/wk · Wks 6–12
Peak weeks (finish phase) combined$2,500–$3,375/wk · Wks 8–10
Phase 1 Design Fee (with wardrobe)$15,300
Phase 1 PM + Sourcing: estimated total$19,000–$33,300
Phase 1 Full Estimated Investment$34,300–$48,600

Payment Schedule

At Signing50% of design fees: non-refundable. Work begins immediately.
50% Design
At Design ApprovalRemaining 50% of design fees due when all plans are approved
50% Design
PM & SourcingBilled bi-weekly at actual hours: invoiced with full time log attached
Bi-Weekly
Samples & MaterialsSparrow+Aire will issue a notice of cost for all samples and materials prior to ordering. Client pays upfront before any order is placed. No exceptions.
Pre-Paid
Wardrobe (if selected)50% at design approval, 50% at construction completion
Separate
Material OrdersNo order placed without written client approval and payment received
Pre-Paid
A detailed project schedule will be provided at kickoff following contract execution. Phase 1 is estimated at 9–12 weeks depending on GC sequencing and material lead times.

Process & Protocol

How this engagement flows from design concept through construction closeout, and how we stay aligned every week. This protocol is referenced in the project agreement and shared with your GC at kickoff.

Engagement Flow

01
Phase
Construction Design
Technical drawings, MEP coordination, renders and specifications
⬡ Space Planning
⬡ Elevation Drawings
⬡ MEP Coordination
⬡ Cabinetry Shop Drawings
⬡ Material Spec Boards
⬡ 3D Renders
⬡ FF&E Boards
◆ 50% Design Fee Due at Signing
Work begins immediately upon signed agreement and deposit. Floor plans and inspiration references required within 48 hours of signing. All design deliverables presented for review and approval within 10 business days of kickoff. Two rounds of revisions included per space.
✦
Milestone
Design Plans Approved
Client and GC sign off on all drawings and specifications
◆ Remaining 50% Design Fee Due at Approval
Once all construction drawings, renders, and specifications are approved: the remaining design fee balance is due. GC receives the full approved drawing package and construction can begin. This milestone gates the move into active construction and sourcing.
02
Phase
PM & Trade Coordination
Weekly schedules, site visits, status reports and GC liaison
◷ Weekly Schedules to GC
◷ Site Visits + Photo Log
◷ Friday Status Reports
◷ Weekly Client Check-In
◷ Bi-Weekly Material Meetings
◷ Spec Compliance Review
◷ $125/hr · Billed Bi-Weekly · 10–12 hrs/week
Runs concurrently with construction from demo through closeout. Kimberly acts as the coordination layer between you and your GC: building and passing weekly schedules, visiting site, logging progress, and keeping you informed without requiring you to manage the GC directly.
◈
Trigger
Sourcing Phase Begins
Framing and rough systems complete: soft finishes open for sourcing
◈ Written Notice Sent · Client Confirmation Required · Clock Starts
Once demo and rough-in are complete and framing is underway, a formal written confirmation is sent: sourcing phase is opening. You confirm in writing before any sourcing hours begin. From this point, soft finish sourcing runs alongside PM at $125/hr, 10–15 hrs/week as needed.
03
Phase
Soft Finish Sourcing
Lighting, hardware, faucets, sinks, toilets, paint, switch plates
◆ Lighting Fixtures
◆ Door Hardware
◆ Faucets & Sinks
◆ Toilets
◆ Switch Plates
◆ Paint Selections
◆ $125/hr · Billed Bi-Weekly · 10–15 hrs/week
All samples and materials invoiced to client before any order is placed. No purchase made without written client approval and pre-payment. Sessions over 3 hours require client confirmation before the clock starts.
04
Phase
Closeout
Punch list review, final confirmations and GC sign-off
◇ Punch List Review
◇ Spec Compliance Final Check
◇ Final Site Log
◇ GC Sign-Off Documentation
◷ $125/hr · Final Bi-Weekly Invoice Issued
Kimberly reviews completed work against approved specifications, documents any outstanding items, and communicates final punch list to you and your GC. Final PM invoice issued upon closeout confirmation.

Site Coordination Protocol

This protocol is referenced in the project agreement and introduced to your GC at kickoff. It is how we keep every phase of your renovation on schedule and on budget, without you having to manage your contractor directly.

◷

Weekly Client Check-In

One 30-minute call per week during active construction: covering what was completed, what is behind, and what decisions are needed before the following week begins. Written summary sent after every call.

◆ What was completed this week and what is still outstanding
◆ What is behind schedule and why
◆ Decisions needed from you before Monday
◆ What is scheduled for the following week
◆ Written summary and site photos sent after every call
◆ Ad hoc calls available for time-sensitive decisions between check-ins
01

GC Introduction at Kickoff

At kickoff, you formally introduce Kimberly to your GC as the design and coordination point of contact. This is documented in the project agreement and communicated in writing to all parties. Kimberly is introduced to him: not the other way around. His relationship is with you.

02

Weekly Client Check-In

One structured 30-minute call per week covers what was completed, what is behind, and what decisions are needed before the following week begins. A written summary is sent after every call. Ad hoc calls available as needed when time-sensitive decisions arise between check-ins.

03

Weekly Schedule to GC

Every Monday, Kimberly sends a written schedule to your GC confirming which trades are expected on site that week and what must be completed by Friday. This keeps the build sequenced and gives your GC a clear weekly target regardless of how he prefers to run his days.

04

48-Hour Confirmation

48 hours before any scheduled install or critical milestone, Kimberly confirms with your GC. If something is slipping at this point there is still time to adjust sequencing or escalate: protecting your timeline from last-minute disruption.

05

Friday Site Walkthrough & Field Log

Kimberly visits site every Friday for a final walkthrough to observe what has been completed that week and collect updates directly from the GC. The GC is responsible for providing field notes, material samples, and vendor information during this visit so Kimberly can compile an accurate weekly report for you. What gets reported reflects what the GC makes available on site: if field notes or materials are not provided at the Friday visit, that gap is documented and flagged in the report.

06

Escalation Protocol

Kimberly does not have direct authority over your GC: you do. When a delay, deviation, or quality issue arises, it is documented immediately and flagged to you in writing with the timeline impact and recommended next step. You direct your GC from there. Nothing sits until Friday.

07

Friday Status Report

Every Friday a concise written summary is sent: what was completed this week, what is behind and why, what decisions are needed before Monday, and what is scheduled for the following week. Site log and photos included. You always know exactly where your project stands.

Trade coordination, site logging, schedule management, and client check-ins are all billable PM time at $125/hr: not absorbed into the design fee. All hours are tracked and reported bi-weekly so you always see exactly what you are being billed for.

Interior Design Services

Full home interior design: separate from Phase 1 construction. Available to begin immediately for Phase 1 zones and continues through Phase 2 and Phase 3 as each space is completed.

Choose Your Fee Structure

Best Value
Option 01: Full Home Flat Rate
$14,736
$8 per sqft × 1,842 sqft
Entire home: all 10 rooms included
All 10 rooms covered
2D mood boards per room
3D renders
Floor plans and technical drawings
Up to 2 revisions per room
Lowest rate: commit to the full home upfront
Multi-Room
Option 02: Per Room (3+ rooms)
$2,100/room
3 or more rooms at a time
e.g. 5 rooms = $10,500
2D mood board per room
3D renders
Floor plans and technical drawings
Up to 2 revisions per room
Good for phased approach: committing to 3 or more rooms
Flexible
Option 03: Per Room (1–2 rooms)
$2,800/room
1 or 2 rooms at a time
e.g. 2 rooms = $5,600
2D mood board per room
3D renders
Floor plans and technical drawings
Up to 2 revisions per room
Highest per-room rate: best for occasional or partial scope
What You Save by Committing to the Full Home
10 rooms at Option 03 rate ($2,800/room)$28,000
10 rooms at Option 02 rate ($2,100/room)$21,000
Full Home Flat Rate (Option 01)$14,736
You save vs. per-room$6,264 – $13,264

Room-by-Room Breakdown

Master Bedroom
·2D mood board
·Floor plan + furniture layout
·Material spec board
·3D render
Master Bathroom
·FF&E board
·Material spec board
·Floor plan + elevation drawings
·3D render
Guest Bedroom 1
·2D mood board
·Floor plan + furniture layout
·Material spec board
·3D render
Guest Bedroom 2
·2D mood board
·Floor plan + furniture layout
·Material spec board
·3D render
Guest Bedroom 3
·2D mood board
·Floor plan + furniture layout
·Material spec board
·3D render
Guest Bathroom
·FF&E board
·Material spec board
·Floor plan + elevation drawings
·3D render
Powder Bath
·FF&E board
·Material spec board
·Elevation drawings
Kitchen
·FF&E board
·Material spec board
·Floor plan + elevation drawings
·3D render
Living Room
·2D mood board
·Floor plan + furniture layout
·Material spec board
·3D render
Dining Room
·2D mood board
·Floor plan + furniture layout
·Material spec board
·3D render
Interior Design Payment
50% at signingBased on elected option
50% at first deliverable submissionNon-refundable once work begins

PM, Procurement & Installation Rates

◷
Project Management
$125/hr
Up to 20–25 hours per week during active construction. Billed bi-weekly.
◆
Procurement
$125/hr
Hourly rate covers all sourcing, vetting, coordinating and delivery management. All finishes and furnishings priced as presented: no separate markup line.
⬡
Installation & Staging Oversight
$500/day
Designer on site overseeing furniture delivery, assembly, mounting and final layout. Typically 1–2 weeks at project completion.
◈
Staging Crew Labor
$325/day
Per person. Separate from Designer oversight. Client may use own handyman: Designer still oversees final layout and staging.
Interior design services run across all three phases as each space is completed. Phase 1 rooms begin immediately upon signing. Phase 2 and Phase 3 rooms are designed as those spaces enter their construction window. Committing to the full home flat rate locks in the best per-room value regardless of when each room is executed.

Project Phases Overview

Full renovation broken into three phases. Client remains in the home through Phase 2 and Phase 3.

01
Phase 1: Priority Move-In
·Kitchen remodel
·Guest bath remodel
·Master bath addition
·Chimney removal + open concept
·Flooring throughout (add-on)
·Wardrobe / closet build (add-on)
8–10 weeks · $104,500 base
02
Phase 2: Bedrooms & Utility
·3 guest bedrooms
·Laundry room
·Powder bath
Timeline + pricing TBD
03
Phase 3: Indoor / Outdoor
·Full back wall bifold glass doors
·Indoor / outdoor living facing pool
·Structural and framing work
Timeline + pricing TBD
Phase 2 and Phase 3 pricing will be presented as separate proposals once Phase 1 is underway and GC availability and material costs can be confirmed. Full home interior design covers all phases under one agreement.

Notes & Terms

General Contractor & Material Sourcing

Your General Contractor is responsible for sourcing all major construction materials including cabinetry, countertops, stone, tile, vanities, sinks, and toilets. Designer provides an inspiration material board as the vision guideline for all GC sourcing. If materials sourced by the General Contractor deviate from approved specifications, Designer reserves the right to reject non-conforming materials and require substitution at no additional design fee. Designer is not responsible for the quality, cost, or lead time of materials sourced independently by the General Contractor.

Soft Finish Sourcing

If sourcing support beyond the inspiration material board is requested — lighting, door hardware, faucets, sinks, toilets, switch plates, paint selections — that work is billed at $125/hr. A written confirmation is issued before any sourcing hours begin. No sourcing session over 3 hours starts without your green light. All samples and materials are invoiced to you before any order is placed: no order is placed without your written approval and pre-payment in full.

Designer Sourcing Policy

All finishes, furnishings and materials coordinated through Designer's design process must be purchased through Designer. If you independently purchase a product that was recommended, specified, approved, or coordinated by Designer, a design coordination fee of 20% of your purchase price applies: this reflects the design intent, research and approval process that informed the selection regardless of where the final purchase is made.

Revisions

Two rounds of revisions are included per space after the full design presentation has been submitted. A revision is defined as one consolidated set of feedback per round. Revisions that materially change the original design direction are considered a redesign and billed at $125/hr.

Client Assets Required

The 10-business-day design delivery clock begins once both of the following are received: deposit payment cleared in full, and 5–7 inspiration images per space plus existing home floor plans. Delays in providing these materials will delay the delivery timeline accordingly.

Hidden Hallway Wardrobe

The wardrobe design fee of $1,800 covers space planning, concealed panel coordination with your GC, interior cabinetry and shelving layout, and finish specification. This is a design fee only: your General Contractor executes the build. Final scope is subject to field measurements of the hallway span. Payment is 50% at design approval and 50% at construction completion.

Payment Terms

All invoices are due upon receipt. Late payments are subject to a 12% annual interest charge after 30 days. Designer reserves the right to pause services and withhold deliverables until the account is current. No product orders are placed before payment is received in full.

Phase 2 & Phase 3

Phase 2 and Phase 3 are separate scopes requiring separate agreements and deposits. Full home interior design services will be revisited upon completion of Phase 1 construction. Pricing for each phase will be presented at that time.

Design Process & Payment Flow

A clear picture of how we work together: from first concept to final installation. Each phase has its own deliverables and billing structure so there are never any surprises.

01
Phase
Design Concept
Mood boards, floor plans, 3D renders & technical drawings
⬡ 2D Mood Boards
⬡ Floor Plans
⬡ 3D Renders
⬡ Material Spec Boards
⬡ FF&E Boards
⬡ Technical Drawings
◆ 50% Design Fee Due at Signing
Work begins immediately upon receipt of signed agreement and deposit. Client provides existing floor plans and inspiration references within 48 hours of signing. All design deliverables (mood boards, floor plans, renders and drawings) are presented for client review and approval within 10 business days of kickoff.
✦
Milestone
Design Plans Approved
Client signs off on all design deliverables
◆ Remaining 50% Design Fee Due at Approval
Once you have reviewed and approved all design concepts, floor plans, renders and drawings: the remaining design fee balance becomes due. This milestone gates the move into procurement and construction.
02
Phase
PM & Procurement
Trade coordination, sourcing, ordering & delivery management
◷ Trade Scheduling
◷ Material Sourcing
◷ Order Management
◷ Site Visits
◷ Delivery Coordination
◷ Weekly Status Reports
◷ $125/hr · Billed Bi-Weekly · Up to 20–25 hrs/week
This phase runs concurrently with construction. All finishes, furnishings and materials are sourced through Designer and presented with pricing for your approval before any purchase is placed. No order is placed without your written approval and payment.
03
Phase
Installation & Staging
Furniture delivery, assembly, mounting & final layout
⬡ Delivery Oversight
⬡ Assembly Coordination
⬡ Art & Mirror Mounting
⬡ Final Layout
⬡ Styling
⬡ Final Walkthrough
⬡ Designer: $500/day · Billed Weekly
⬡ Staging Crew: $325/day per person · Billed Weekly
Typically 1–2 weeks at project completion. Client may use their own handyman for staging labor: Designer still oversees the final layout and staging at the daily oversight rate. This is the phase where your home comes to life.
Payment Flow at a Glance
◆
At Signing
50%
Design fee deposit: non-refundable. Work begins immediately.
✦
At Design Approval
50%
Remaining design fee balance: due when all plans are approved.
◷
PM & Procurement
$125/hr
Billed bi-weekly at actual hours. Up to 20–25 hrs/week.
⬡
Installation
$500/day
Designer oversight billed weekly. Staging crew billed separately at $325/day per person.
Every purchase requires your written approval and payment before an order is placed. You are never surprised by a charge: every invoice is accompanied by the corresponding proposal or time log before payment is due.

How We Stay Aligned: Project Communication Protocol

This protocol is referenced in the project agreement and shared with all trades at kickoff. It is how we keep every phase of your renovation on schedule and on budget.

◷

Weekly Client Check-In

One 30-minute call per week during active construction phases: plus ad hoc calls as needed when decisions or issues arise between scheduled check-ins.

Weekly · Direction & Decisions Ad Hoc · As Needed
01

Kickoff & Contact Setup

At kickoff, all relevant contacts: GC, trades, vendors: are formally introduced to Kimberly as the scheduling and coordination point of contact. This is documented in the project agreement and communicated in writing to all parties.

02

Weekly Client Check-In

One structured 30-minute call per week covers what was completed, what is behind, and what decisions are needed before the following week begins. A written summary is sent after every call. Ad hoc calls are available as needed between check-ins when time-sensitive decisions or issues arise.

03

Monday Trade Confirmation

Every Monday, Kimberly sends text confirmation to each trade scheduled for that week. No response within 4 hours triggers an immediate escalation to the GC. You are never in a position where a trade simply does not show up without notice.

04

48-Hour Callback

48 hours before any scheduled install or delivery, Kimberly calls to reconfirm. If a trade cancels at this point there is still time to adjust sequencing or find a replacement: protecting your timeline from last-minute disruption.

05

Same-Day Site Log

Every site visit is logged with timestamp, photos, and a written summary of what was observed. This creates a documented record of progress, contractor performance, and any issues that arise: shared with you in your weekly status report.

06

Escalation Protocol

Any no-show, significant delay, or quality issue is documented and communicated to you immediately: not at the end of the week. The GC is responsible for resolution. Kimberly communicates the timeline impact and the required next steps clearly and in writing.

07

Friday Status Report

Every Friday a concise written summary is sent covering: what was completed this week, what is behind and why, what decisions are needed before Monday, and what is scheduled for the following week. You always know exactly where your project stands.

Trade coordination, scheduling, site logging, and client check-ins are all billable PM time at $125/hr: not absorbed into the design fee. All hours are tracked and reported bi-weekly so you always see exactly what you are being billed for.

Full Agreement , All Schedules

Complete terms of engagement: Schedules A through K. Please read all sections carefully before signing.

This Agreement, including all schedules referenced herein, confirms the understanding between Kimberly V Gedeon / Sparrow+Aire Studio LLC (the "Designer") and Devan & Dani Terry (the "Client") with respect to the property at 3806 Carmona Ave, Los Angeles, CA (the "Project"). The General Contractor is retained directly by Client and executes all physical construction. This Agreement covers Designer's construction design services, project coordination, and soft finish sourcing oversight for Phase 1 of the Project.
Schedule A: Preliminary Project Information
1. Project Area
Full residence at 3806 Carmona Ave, Los Angeles, CA. Approximately 1,842 square feet. 4 bedrooms, 3 bathrooms including master bath addition.
2. Proposed Investment
Phase 1 design fee is $13,500 flat, covering construction design services for the kitchen, master bath addition, and guest bath. An optional add-on design fee of $1,800 applies to the hidden hallway wardrobe. Project Management, Trade Coordination, and Soft Finish Sourcing are billed at $125/hr as described in Schedule B-3 and Schedule C. The General Contractor is responsible for all construction costs, materials, and permit fees. Designer does not advance construction costs, permit fees, or material costs on behalf of the client.
3. Investment Estimates
While Designer will best endeavor to implement plans within the proposed investment, in light of the many factors outside of our control, Designer does not represent or guarantee that Project costs will not exceed these investment estimates or any revised investment proposed or approved by you.
4. Project Team
Your Designer for the Project is Kimberly V Gedeon, Sparrow+Aire Studio LLC. The General Contractor is retained directly by Client and is not a party to this Agreement.
Schedule B: Phase 1 Construction Design Services
Designer will provide the following construction design services for the three Phase 1 zones: Kitchen, Master Bath Addition, and Guest Bath. The General Contractor executes all physical construction. These services cover the design work that makes the build buildable and intentional.
1. Design Deliverables Per Space
For each of the three Phase 1 spaces, Designer will provide a full design presentation including:
Design Vision Moodboard: 2D curated board establishing the design direction for the space
Space Planning & Functional Floor Plan Layout
Cabinetry shop drawing coordination with General Contractor
Elevation drawings (all four walls for kitchen; shower, vanity, and feature walls for baths)
MEP (Mechanical, Electrical & Plumbing) coordination drawings
Lighting and electrical coordination
Fixture and finish specification board
Inspiration material board: curated vision guideline for GC sourcing of cabinetry, stone, tile, and finishes
3D render for client approval before GC builds
2. Delivery Timeline
Full design presentation including all deliverables is due 10 business days from the date deposit and all required client materials are received. The 10-business-day clock begins once both conditions are satisfied: (a) deposit payment cleared, and (b) client has provided all required materials per Schedule K, Section 5.
3. Material Sourcing Responsibility
General Contractor is responsible for sourcing all major construction materials including cabinetry, countertops, stone, tile, vanities, sinks, and toilets. Designer provides an inspiration material board as the vision guideline for all GC sourcing. If materials sourced by the General Contractor deviate from approved specifications, Designer reserves the right to reject non-conforming materials and require substitution at no additional design fee. Designer is not responsible for the quality, cost, or lead time of materials sourced independently by the General Contractor.
4. Revisions
Two rounds of revisions are included per space after the full design presentation has been submitted. A revision is defined as one consolidated set of feedback per round. Revisions that materially change the original design direction or scope are considered a redesign and billed at $125 per hour.
5. Optional Add-On: Hidden Hallway Wardrobe
Design fee of $1,800 covers: full-span hallway space planning and layout, concealed panel mechanism coordination with GC, interior cabinetry, shelving, and rod layout, and material and finish specification to match surrounding hallway. Final scope subject to field measurements. Construction labor and materials are GC's scope. Payment: 50% at design approval, 50% at construction completion.
Schedule B-3: PM, Trade Coordination & Soft Finish Sourcing
All services under this Schedule are billed at $125/hr and invoiced bi-weekly at actual hours worked. A full time log with dates, tasks, and hours accompanies every invoice.
1. Project Management & Trade Coordination
Building and passing weekly schedules to General Contractor
Weekly status reports to client every Friday, including site visit photos and field log
Liaison between client and General Contractor: Designer flags issues to client; client manages GC directly
48-hour confirmation before scheduled installs or critical milestones
Bi-weekly client material meetings to review samples, confirm selections, and resolve spec deviations
Estimated billing: $1,250–$1,500/week during Weeks 1–7; $1,250–$1,875/week during Weeks 8–12. These are planning estimates, not caps. Actual hours billed.
2. Soft Finish Sourcing
When requested beyond the inspiration material board provided under Schedule B, Designer will source soft finishes including lighting fixtures, door hardware, faucets, sinks, toilets, switch plates, and paint selections at $125/hr. Three-step sourcing notification protocol applies before any sourcing hours begin:
Phase Transition Notice: Written confirmation issued when sourcing phase opens. Client written confirmation required before the clock starts.
Friday Report Preview: Every Friday report closes with a sourcing preview for the following week. Accuracy depends on field notes, samples, and vendor information provided by the General Contractor during site visits.
Session Authorization: Any single sourcing session exceeding 3 hours requires client written confirmation before it begins.
3. Samples & Materials Pre-Payment Policy
Sparrow+Aire Studio does not advance the cost of samples or materials on behalf of the client. Prior to placing any order, Designer will issue a written confirmation of cost itemizing the sample or material, vendor, quantity, and total due. Client pays that amount in full before the order is placed. This applies to every purchase regardless of size. No exceptions.
Schedule C: Construction Design Fees
1. Phase 1 Client Investment
ServiceFee
Kitchen, Master Bath Addition, Guest Bath: Three-Space Design Package$13,500 flat
Hidden Hallway Wardrobe: Optional Add-On Design Fee$1,800
PM & Trade Coordination: $125/hr, 10–12 hrs/week estimatedBilled bi-weekly
Soft Finish Sourcing: $125/hr, 10–15 hrs/week when authorizedBilled bi-weekly
Samples & MaterialsPre-paid by client before each order
2. Hourly Rates
RoleRate
Principal Designer$125 per hour
PM & Trade Coordination$125 per hour
Soft Finish Sourcing$125 per hour
Hourly rates are in addition to all other fees and will be invoiced bi-weekly with full time log attached.
3. Payment Schedule
50% of Phase 1 design fee due at signing — non-refundable. Work begins immediately upon receipt.
50% of Phase 1 design fee due at design approval — when all plans, renders, and specifications are approved by client.
PM, Trade Coordination & Sourcing — billed bi-weekly at actual hours with full time log attached.
Samples & Materials — invoiced by Designer prior to each purchase. Client pays in full before any order is placed.
Wardrobe design fee if elected — 50% at design approval, 50% at construction completion.
4. Payment Terms
All of Designer's invoices are payable upon receipt. Any amounts not paid when due are subject to an interest charge of twelve percent (12%) per annum after 30 days. Designer may suspend services and withhold any item of Merchandise until payment has been made in full. All Designer compensation is subject to applicable state and local sales and excise taxes and you agree to pay these taxes.
Schedule D: Selection of Merchandise
1. Selection and Specification of Merchandise
Research, design and procure merchandise such as furniture, wall coverings, floor coverings, window treatments, fixtures, decorative accessories, art, stone, tile, and the like
Provide fabric samples, finish samples, photographs, and/or other visual illustrations of merchandise for client consideration
Provide written purchase specifications for approved Merchandise
2. Installation
Designer will, at the conclusion of the Project, assist with final placement of decorative merchandise at the residence.
Schedule E: Purchasing Services
1. Purchasing Services
Designer will provide purchasing services in accordance with the terms set forth below. All Merchandise and Decorative Installations sold by or through Designer are subject to Schedule H: Terms and Conditions of Sale.
2. Proposals
Each item of Merchandise to be purchased by you will be specified in a written proposal prepared by Designer and submitted for your approval. Each Proposal will describe the item or service to be purchased and its specified price to you.
3. Ordering and Payment
All Merchandise specified by Designer will, if you wish to purchase them, be purchased solely through Designer. No item can be ordered until the corresponding Proposal has been approved by you and returned with the required initial payment of at least fifty percent (50%) of the Specified Price. Custom orders, fabrics, wallpaper, accessories, antiques, and art require full payment at time of signed Proposal.
4. Order Management
Designer will assist in managing your orders and following up with vendors regarding any delays or errors in processing your orders, and in scheduling and coordinating deliveries with vendors to your residence.
5. Merchandise Inspection
You will be solely responsible for receiving, uncrating, and inspecting Merchandise for any visible damage upon receipt. All claims including defects, shortages and errors must be made within one (1) day after receipt of the Merchandise. Failure to make any claim within such one (1) day period shall constitute acceptance of the Merchandise and a waiver of said defects, shortages, errors, or other claims.
Schedule F: Installation & Project Administration Services
During the course of the Project, Designer will visit your residence from time to time as deemed necessary to oversee placement and installation of furnishings and merchandise, as well as manage contractors and third-party installers. Designer will also visit your residence from time to time as deemed necessary to see whether, in our opinion, the work of any contractor, subcontractor, or vendor is proceeding in general conformity with our Design Documents ("Project Administration Services").
Designer is not responsible, however, for the performance or timely completion of any work by any contractor, subcontractor, or vendor, or of any materials or equipment furnished by them.
Schedule G: Full Home Interior Design Services
Full home interior design services are not included in this Phase 1 Agreement. This schedule is reserved for future engagement and will be revisited upon completion of Phase 1 construction. At that time, client may elect one of the following fee structures for the full home interior design scope across all remaining phases.
1. Fee Structure Options (Pending Phase 1 Completion)
Option 01: Full Home Flat Rate: $8.00 per sqft x 1,842 sqft = $14,736. All 10 rooms included. Best value.
Option 02: Per Room (3+ rooms): $2,100 per room. For clients committing to 3 or more rooms at a time.
Option 03: Per Room (1–2 rooms): $2,800 per room. For occasional or partial scope.
Selection of fee structure will be confirmed in writing under a separate agreement prior to commencement of full home interior design services. Rates are subject to adjustment at the time of the Phase 2 engagement based on current market conditions.
Schedule H: Terms and Conditions of Sale
Price Changes
Proposal prices are adhered to as much as possible. Designer reserves the right to increase your price accordingly due to supplier price changes. You will be notified of any price increases; and when the price increases by more than ten percent (10%) over the original Proposal price, your written approval will be obtained prior to purchase.
No Cancellations or Returns
All Proposals approved by you in writing are non-cancelable unless expressly agreed upon in writing. Designer will not, under any circumstances, accept cancellation of any custom or special order. Should Designer accept a cancellation of an order, Designer shall have the right to retain payments equal to the compensation or fees that would have been earned had the order not been cancelled.
Change Orders
Work change orders (WCO) will be issued for additional work and changes requested after approval of plans or commencement of work. WCOs include a description of the change requested, estimated additional costs, and changes to work schedules. Client's signature is required on WCOs to proceed.
Product Taken on Approval
You agree to make purchasing decisions within twenty-four (24) hours of all items taken on approval. Any items of Merchandise held for more than twenty-four (24) hours without your rejecting the proposed Merchandise will be invoiced to you, and your payment will be due upon your receipt of the invoice. All Merchandise delivered to you will incur shipping and/or delivery charges regardless of whether the item was purchased.
Client's Failure to Accept Delivery
Any Merchandise not accepted for delivery within fourteen (14) days after notification is subject to storage charges as determined by Designer. You will bear the risk of loss or damage during such transfer and storage.
Carrier as Agent of the Client
All shipments are made F.O.B. place of origin. If Designer arranges for delivery of Merchandise, the carrier shall be deemed your agent. Designer shall not be responsible, in any event, for any damage caused to the Merchandise during shipment, transfer, or while in storage. All claims for freight overcharge or damage to goods while in transit must be settled with the carrier.
Sales Taxes and Other Charges
All delivery, packing, crating, shipping, in-transit insurance, local delivery, hoisting, uncrating and installation charges, sales taxes, excise taxes, or other taxes are in addition to the stated purchase price. You shall be responsible for the payment of all applicable taxes and charges.
Credit Card Fees
If client opts to pay invoices with credit card, client is solely responsible for the applicable credit card fees (2.9% or current rate).
Delivery is Approximate
Quoted delivery dates are approximate dates only. Designer shall not be responsible for any delay in delivery or failure in performance for any cause beyond our reasonable control including but not limited to labor disputes, failure or delay of sources to supply, transportation difficulties, accidents, fires, or acts of God.
Exclusion of Warranties
Designer does not make any representations or warranties of any kind regarding any Merchandise, decorative finishes, Decorative Installations, moving services, delivery services, installation specialists or other contractors, vendors, or suppliers recommended by us. ALL OTHER WARRANTIES, EITHER EXPRESS OR IMPLIED, ARE EXPRESSLY EXCLUDED, INCLUDING BUT NOT LIMITED TO, THE WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE.
Limitation of Liability
In no event shall Designer be liable for any consequential or incidental damages. In no event shall our liability arising out of or resulting from your purchase of any item of Merchandise or any Decorative Installations under this Agreement, for any reason, exceed the amount actually paid by you to us for the concerned item of Merchandise or for the concerned Decorative Installation.
Schedule I: Termination Rights
1. Termination for Cause
This Agreement may be terminated by either party upon the other party's default in performance, provided that the terminating party provides the defaulting party with written Notice specifying the nature and extent of default, and the defaulting party fails to cure the default within twenty (20) days after receiving the written Notice. Termination for cause shall be without prejudice to any and all other rights and remedies that we may have, and in such event, you shall remain liable for all outstanding obligations owed by you to us.
2. Your Right to Terminate Without Cause
You may, upon ten (10) days written Notice to us, terminate this Agreement for any reason. Should you terminate this Agreement, you will remain financially obligated and responsible for all services completed, all Merchandise ordered, and all other commitments set forth in signed Proposals. In addition, you shall be obligated to pay all monies due to us under this Agreement, including unpaid invoices, Design Fees, Hourly Rates, Project Administration Fees, Procurement Fees, and Reimbursable Expenses, whether or not such invoices have been rendered.
Schedule J: Dispute Resolution
1. Venue
Any party bringing a legal action or proceeding against any other party arising out of or relating to this Agreement shall bring the legal action or proceeding only in any court of the State of California sitting in the County of Los Angeles. Each party submits to the exclusive jurisdiction of such courts and expressly waives any jurisdictional or venue defenses otherwise available to them.
2. Choice of Law
This Agreement shall be construed in accordance with and governed by the laws of the State of California, without regard to conflict of laws principles.
3. Mediation
In the event of any dispute between the parties, each party agrees first to try in good faith to settle the dispute through mediation administered by a Mediator in the County of Los Angeles, State of California, before resorting to arbitration.
Schedule K: Additional Terms and Conditions
1. Design Documents
All drawings, specifications, plans, sketches, and other documents prepared by Designer are conceptual in nature and intended to set forth our design intent only. We do not and are unable to perform architectural, engineering, or construction services. Our Design Documents must not be used by you or by any other person for architectural, engineering, or construction purposes. We make no representations that any recommendations set forth in any Design Document will meet applicable code or regulatory requirements.
2. General Contractor Relationship
Client's General Contractor is retained directly by Client and is not a party to this Agreement. Designer is not responsible for the General Contractor's work, schedule, costs, quality, or compliance with approved design specifications. Designer's role is to provide design intent, specifications, and coordination — not to supervise, direct, or control the General Contractor. If materials sourced by the General Contractor deviate from approved specifications, Designer reserves the right to document the deviation and flag it to Client. Client is responsible for directing the General Contractor to remediate any non-conforming work.
3. Designer Sourcing Policy
All finishes, furnishings and materials coordinated through Designer's design process must be purchased through Designer. If the client independently purchases a product that was recommended, specified, approved, or coordinated by Designer, a design coordination fee of 20% of the client's purchase price applies. This fee reflects the design intent, research, and approval process that informed the selection, regardless of where the final purchase is made.
4. Your Responsibilities to Us
In order to provide you with services, you agree to provide Designer with access to the Project site as well as all information we may need to complete the Project. To begin design work and start the 10-business-day delivery clock, the following must be provided in full:
Deposit payment cleared in full
Existing home floor plans for all Phase 1 zones
5–7 inspiration images per space (for design alignment and moodboard development)
The 10-business-day clock begins once deposit and all required materials are received. Delays in providing these materials will delay the design delivery timeline accordingly.
5. Reimbursable Expenses
Out-of-pocket expenses actually and reasonably incurred by us in the interests of your Project will be submitted to you for reimbursement and are payable upon receipt of our invoices. Reimbursable Expenses may include, without limitation, samples, postage/FedEx/UPS charges, photocopying, parking, travel costs (in excess of 100 miles), wire fees, freight, delivery, storage costs, blueprints, duplications of plans and specifications, and messenger services. Reimbursable Expenses will be billed to you at their actual cost.
6. Ownership and Use of Design Documents
All of our Design Documents are owned by Designer and will be our exclusive property at all times, and we will retain all intellectual property rights and proprietary rights, including copyrights and trademarks. You may use our Design Documents only as permitted by this Agreement.
7. Indemnification
To the fullest extent permitted by law, you agree to indemnify and hold Designer harmless from and against any and all third-party claims, losses, liabilities, damages, costs, and expenses (including reasonable attorneys' fees) relating to, arising out of or resulting from the actions and omissions of you and/or of any General Contractor, subcontractor, vendor, tradesperson, supplier, agent, or other third party hired or otherwise retained by you or on your behalf.
8. Limitation of Liability
To the fullest extent permitted by law, our total liability to you shall not for any reason exceed the total amount of Design Fees and other Designer compensation actually paid to us pursuant to this Agreement. Under no circumstances shall we be responsible for any indirect or consequential damages, or for the actions or omissions of any General Contractor, subcontractor, vendor or other third party. No action against us for breach of this Agreement or otherwise may be brought more than one (1) year after the date of the accrual of such cause of action.
9. Consent to Photograph Project
You will permit us or our representatives to photograph, video and/or otherwise record images of the Project Areas and your residence before, during, and after Project completion for our business purposes including publication. We will not identify your name and address in any such publication without your prior written consent.
Other Matters
This Agreement can be modified only by a writing signed by an authorized representative of each party.
In case any provision of this Agreement shall be held invalid or unenforceable, all remaining provisions shall continue to be valid and binding.
All rights and obligations which by their nature would be expected to survive termination of this Agreement shall survive completion, termination or expiration of this Agreement.
Signed counterparts of this Agreement may be exchanged by email or other electronic means.
This Agreement is a complete statement of our understanding. No other representations or agreements have been made other than those contained in this Agreement.
The Parties acknowledge that they have read, understood, sought access to legal counsel if necessary, and agree to the terms contained in this Agreement.
Agreed and Accepted